Brosnahan Remodel Progress
Before
Remodel plans (rough drawings)
June 2: Before remodel starts
Week 1
June 3: Demolition begins
June 4: Jackhammering complete
June 5: Digging out the foundation
June 6: Roof and stucco coming off
June 7: Chimney gets a haircut
Week 2
June 10: Building forms for foundation
June 11: Pouring concrete
June 12: Removing living room windows
June 13: Framing the subfloor
June 14: Uncovering the master
Week 3
June 17: Take my roof, please.
June 18: Bye, bye bathroom
June 19: No more master bath
June 20: Light and airy living room
June 21: No ceiling
June 22: New walls and beams
Week 4
June 24: Walls and water
June 25: Doors and hot water
June 26: Floor, Insulation, and Extra Piers
June 27: Chimney and Walls!
June 28: Finishing framing the walls
June 29: Ceiling Joists Secured
Week 5
July 1: The Big Wall
July 2: Vaulted Ceiling
July 3: Plywood Everywhere
Week 6
July 8: Insulation!
July 9: Rafters and Window Holes
July 10: Vents
July 11: Peeking through Walls
July 12: Eaves
Week 7
July 15: Our Little Inspector
July 16: No Clavos, Amigos
July 17: Ripping off the Roof
July 18: Wall gets shaved
July 19: New Windows
Week 8
July 22: The Mantel
July 23: More Windows
July 24: Yet More Windows
July 25: New Side and Back Doors
July 26: Shingles arrive
Week 9
July 29: Shingles and Doors
July 30: Preparing for Stucco
July 31: New Front Door
August 1: New Fireplace
August 2: Door hardware and windows
August 3: Insulation
Week 10
August 5: Casings
August 7: Drywall
August 8: More Drywall
August 9: Cleanup after the drywall crew
Week 11
August 12: Taping
August 13: More drywall work
August 14: More door casings
August 15: Stucco
August 16: Wall Texture
Week 12
August 19: Baseboards
August 20: Doors, Doors, Doors
August 21: Dining room floor
August 22: Cabinets
August 23: Shower Mud
August 24: Cabinets Installed
Week 13
August 26: Crown and Tile
August 27: Polyurethane
August 28: Lots of things
August 29: Prepping for paint
Week 14
September 2: Painting trim
September 3: Paint and tile
September 4: Built-In and Corian
September 5: Grout and mud
September 6: Granite and Electrical
September 7: Doors Return
September 8: Heat Mat
Week 15
September 9: Fireplace tile
September 10: Bathroom floor tile
September 11: Pergo
September 12: More Finishing
September 13: External Trim
Week 16
September 16: California Closets and Electrical Trim
September 17: Lights On
September 18: Light Bars and Mirrors
September 19: Carpet and Rope Lighting
September 20: Plumbing Fixtures
Moving Back In